» Today: 06/05/2024
Equipment
Work starts on US$60 million wind power station
Construction of a 30MW wind power plant started on April 3 at the Nhon Hoi Industrial Park in central Binh Dinh province.


Clean Energy JSC and CP Phuong Mai Wind Power JSC will invest a total of VND1.2 trillion (US$60.25 million) in Phuong Mai Wind Power Plant No 1.

The plant, covering 143 hectares, will be located on Phuong Mai Peninsula where the IP is situated.

Operating in an average wind speed of 12 metres per second, the 12-turbine plant will be able to generate 82 million kWh per year.

Investors in the plant have signed a contract to sell electricity to national power utility Electricity of Vietnam (EVN) for VND1,600 per kWh.

The plant will make a major contribution to the development of clean energy in Vietnam when it starts operations in the second quarter of 2012.

To utilise its great potential for production of clean energy, Binh Dinh province has set aside 283 hectares of land in Nhon Hoi IP for wind-power projects, including Phuong Mai Wind Power Plant No 1.

(VNA) (nnhanh)
Print  
Top
© Copyright 2010, Information and Documentation Center under Can Tho Science and Technology Department
Address: 118/3 Tran Phu street, Cai Khe ward, Ninh Kieu district, Can Tho city Tel: 0710 3824031 - Fax: 0710 3812352 Email: tttlcantho@cantho.gov.vn License No. 200/GP-TTÐT dated November 11st, 2011 by Agency for Radio, Television and Electronic Information under Minister of Information and Communication